Skip to main content

AdminDisc


On Demand

Duration:
17 Minutes
Format:
Audio and Video
License:
Short Description:
The recommended application methods utilized to successfully install Pecora Deck HB1000, a two-part polyurethane traffic coating, will be demonstrated. Demonstration and discussion will include primers, waterproofing base coats, and high-build, UV resistant topcoat.
Base Price:
$5.00
Price with Discount:
$0.00

On Demand

Duration:
1 Hour
Format:
Audio and Video
License:
Base Price:
$40.00
Price with Discount:
$0.00

On Demand

Duration:
1 hour
Format:
Audio and Video
License:
Short Description:
This two-part webinar series discusses structural condition assessment nuances, complexities, and challenges, including corrosion implications, considerations for coastal buildings, safety implications, historical aspects, new assessment tools, regulations, industry standards, and limitations.
Base Price:
$40.00
Price with Discount:
$0.00

On Demand

Duration:
1 hour
Format:
Audio and Video
License:
Short Description:
This two-part webinar series discusses structural condition assessment nuances, complexities, and challenges, including corrosion implications, considerations for coastal buildings, safety implications, historical aspects, new assessment tools, regulations, industry standards, and limitations.
Base Price:
$0.00
Price with Discount:
$0.00

On Demand

Duration:
30 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
The Ituango dam is an embankment dam that is currently under construction on the Cauca River in Colombia. The largest hydroelectric power plant in Colombia’s history. Three large diversion tunnels used to divert the water from the river around the construction site during construction collapsed as a result of heavy rainfalls. The nearly completed pump house had to be flooded to accommodate premature water build-up in the reservoir. These tunnels would need to be permanently sealed. “Pre-stoppers” would need to be constructed in place to serve as bulk heads between which would ultimately be excavated and back-filled with concrete to permanently seal the tunnels. Additional to standard anti-washout properties, the grout had to withstand swiftly flowing water and exhibit an extended working time at temperatures above 32 degrees C. A custom grout was developed for this application. In the end, hundreds of grout micropiles were tremied, consuming more than 1,650 tons of grout, to produce...
Base Price:
$40.00
Price with Discount:
$0.00

On Demand

Duration:
5 Minutes
Format:
Audio and Video
License:
Short Description:
Demonstration will show Schönox AP Rapid Plus poured over Schönox Renotex® 3D Glass Fiber Reinforcement fabric that makes up our Renotex® 3D Renovation System. It is designed to create a new substrate for subsequent floor covering installation. Schönox AP Rapid Plus is a pumpable self-leveling compound designed for deep pour, fast-track installations on most substrates in interior areas. It is built with Hybrid Active-Dry Technology, which means that ambient air temperature and humidity have no effect on curing times. This technology is the culmination of Schönox’s extensive research in this area to develop products with fast strength and drying characteristics with minimal shrinkage or expansion. Combined, the Schönox Renotex® 3D System is strong, versatile, and durable.
Base Price:
$5.00
Price with Discount:
$0.00

On Demand

Bundle(s):
Fall Conference Bundle
Duration:
22 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Post-tensioned concrete is a strong and durable material for construction of exposed parking structures. These types of structures are also fire resistant, but they can be damaged depending upon the severity of the fire. The structure in this presentation suffered significant fire damage early in its construction. The presentation will cover the discovery and testing methods used to determine the extent of fire damage, and the design of the repairs that were instituted to restore strength and allow construction to continue.
Base Price:
$25.00
Price with Discount:
$0.00

On Demand

Bundle(s):
Fall Conference Bundle
Duration:
24 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
In new construction, cracks can appear for variety of reasons: curing, temperature deviation, pressure from adjacent conditions, or settlement. This presentation will outline various types of cracking, how to plan to avoid them, and how to address them after concrete has been placed.
Base Price:
$25.00
Price with Discount:
$0.00

On Demand

Bundle(s):
Fall Conference Bundle
Duration:
25 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Due to improper design or implementation sometimes Part of the New projects are re-executed or repaired. Islamabad - Rawalpindi BRTS (Bus Rapid transit System) Consisted of 20 Stations Covering around 23 km path connecting twin cities. Each station Roof Consisted of ACP Sheets Fixed on Aluminum Frame with Steel supports. The joints of ACP sheets were filled by Silicon but improper materiel and workmanship caused leakage in joints. Total length of joints was over 400,000 RFT. Leakage was invariably from almost every area.
Base Price:
$25.00
Price with Discount:
$0.00

On Demand

Duration:
44 Minutes
Format:
Audio and Video
License:
Short Description:
Historic 19th and 20th century buildings are currently facing the necessity of meeting contemporary needs such as adaptive re-use, energy efficiency, stability, and durability. The characteristics of architecture of these periods (i.e., material, design, details, maintenance, and functionality) increasingly make it challenging to maintain authenticity while incorporating new uses. Various strategies of technical interventions can be employed to achieve good results. This presentation will cover the case study of abandoned historic hospital pavilions from the early 20th century which are being converted into a high-end residential complex. The buildings face multiple challenges related to adaptive re-use, as they will be restored and connected with new infills and a glass connector and capped with re-creation of the historic cornices.
Base Price:
$25.00
Price with Discount:
$0.00

Please wait ...

Back to Top