Skip to main content

Baker-Webinar-2023


On Demand

Duration:
11 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Preparation and repairs of dilapidated concrete structures, such as manholes, concrete walls, and concrete bridge structures will be demonstrated.
Base Price:
$5.00

On Demand

Duration:
17 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
The recommended application methods utilized to successfully install Pecora Deck HB1000, a two-part polyurethane traffic coating, will be demonstrated. Demonstration and discussion will include primers, waterproofing base coats, and high-build, UV resistant topcoat.
Base Price:
$5.00

On Demand

Duration:
1 Hour
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Base Price:
$40.00

On Demand

Duration:
30 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
The Ituango dam is an embankment dam that is currently under construction on the Cauca River in Colombia. The largest hydroelectric power plant in Colombia’s history. Three large diversion tunnels used to divert the water from the river around the construction site during construction collapsed as a result of heavy rainfalls. The nearly completed pump house had to be flooded to accommodate premature water build-up in the reservoir. These tunnels would need to be permanently sealed. “Pre-stoppers” would need to be constructed in place to serve as bulk heads between which would ultimately be excavated and back-filled with concrete to permanently seal the tunnels. Additional to standard anti-washout properties, the grout had to withstand swiftly flowing water and exhibit an extended working time at temperatures above 32 degrees C. A custom grout was developed for this application. In the end, hundreds of grout micropiles were tremied, consuming more than 1,650 tons of grout, to produce...
Base Price:
$40.00

On Demand

Duration:
5 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Demonstration will show Schönox AP Rapid Plus poured over Schönox Renotex® 3D Glass Fiber Reinforcement fabric that makes up our Renotex® 3D Renovation System. It is designed to create a new substrate for subsequent floor covering installation. Schönox AP Rapid Plus is a pumpable self-leveling compound designed for deep pour, fast-track installations on most substrates in interior areas. It is built with Hybrid Active-Dry Technology, which means that ambient air temperature and humidity have no effect on curing times. This technology is the culmination of Schönox’s extensive research in this area to develop products with fast strength and drying characteristics with minimal shrinkage or expansion. Combined, the Schönox Renotex® 3D System is strong, versatile, and durable.
Base Price:
$5.00

On Demand

Bundle(s):
Fall Conference Bundle
Duration:
22 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Post-tensioned concrete is a strong and durable material for construction of exposed parking structures. These types of structures are also fire resistant, but they can be damaged depending upon the severity of the fire. The structure in this presentation suffered significant fire damage early in its construction. The presentation will cover the discovery and testing methods used to determine the extent of fire damage, and the design of the repairs that were instituted to restore strength and allow construction to continue.
Base Price:
$25.00

On Demand

Bundle(s):
Fall Conference Bundle
Duration:
24 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
In new construction, cracks can appear for variety of reasons: curing, temperature deviation, pressure from adjacent conditions, or settlement. This presentation will outline various types of cracking, how to plan to avoid them, and how to address them after concrete has been placed.
Base Price:
$25.00

On Demand

Bundle(s):
Fall Conference Bundle
Duration:
25 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Due to improper design or implementation sometimes Part of the New projects are re-executed or repaired. Islamabad - Rawalpindi BRTS (Bus Rapid transit System) Consisted of 20 Stations Covering around 23 km path connecting twin cities. Each station Roof Consisted of ACP Sheets Fixed on Aluminum Frame with Steel supports. The joints of ACP sheets were filled by Silicon but improper materiel and workmanship caused leakage in joints. Total length of joints was over 400,000 RFT. Leakage was invariably from almost every area.
Base Price:
$25.00

On Demand

Duration:
44 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Historic 19th and 20th century buildings are currently facing the necessity of meeting contemporary needs such as adaptive re-use, energy efficiency, stability, and durability. The characteristics of architecture of these periods (i.e., material, design, details, maintenance, and functionality) increasingly make it challenging to maintain authenticity while incorporating new uses. Various strategies of technical interventions can be employed to achieve good results. This presentation will cover the case study of abandoned historic hospital pavilions from the early 20th century which are being converted into a high-end residential complex. The buildings face multiple challenges related to adaptive re-use, as they will be restored and connected with new infills and a glass connector and capped with re-creation of the historic cornices.
Base Price:
$25.00

On Demand

Duration:
1 hour
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Discover the innovative and sustainable advantages of shotcrete, a highly efficient concrete placement technique that offers engineers unparalleled flexibility in shaping and reinforcing concrete structures while achieving superior strength and durability.
Base Price:
$40.00

On Demand

Duration:
14 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
This demonstration shows Sika's new one coat traffic coating systems. Sikalastic®-720 One Shot is a two-component, integral texture, fast-curing, aliphatic, elastomeric polyurethane waterproofing coating intended for vehicular and pedestrian traffic. Applied in a single step, Sikalastic®-720 One Shot replaces the need for a base coat and multiple topcoats. Sikalastic®-726 Balcony One Shot is a two-component, aliphatic, elastomeric polyurethane traffic coating system that has both superior flexibility and abrasion resistance. Easily applied in a single coat, with or without primer, and designed for pedestrian traffic, specifically balcony and pedestrian applications.
Base Price:
$5.00

On Demand

Duration:
5 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Demonstration will show the use of an anti-washout additive for use in cementitious repair systems. The demonstration will show systems with and without the additive to exhibit the system’s function in water. The additive holds the mortar together to reduce loss of paste material into the surrounding water. This reduces water contamination and improves the performance of the hardened state concrete.
Base Price:
$5.00

On Demand

Duration:
1 hour
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
This webinar covers when and why to use Clear Water Repellents on masonry and concrete.
Base Price:
$40.00

On Demand

Duration:
1 Hour, 2 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
This webinar will review issues that should be addressed when preparing a specification for concrete repair. ICRI developed an editable specification titled “Guide Specification for Structural Concrete Repairs” that can be used by design professionals. The webinar reviews the specification and discusses decisions that should be considered when developing a concrete repair specification.
Base Price:
$40.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
ICRI in-person conventions consist of numerous networking opportunities. In many cases, we catch up with old friends who we have not seen in a while, and get to know new friends. Great stories abound, including how ICRI members came to be involved in the organization. Tune in to hear some of these stories in a relaxed, “sitting-at-the-bar” exchange among notable ICRI leaders.
Base Price:
$40.00

On Demand

Duration:
43 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Technology is not limited to innovative materials or equipment on a jobsite. Digital technology is changing how teams operate and is dramatically increasing efficiency and effectiveness. Cloud-based project management software allows key stakeholders to consolidate project data on to one mobile platform for easy collaboration. The entire project team, from general contractors, specialty contractors, owners, architects, engineers, conservators, and others can exchange data and documents with the tap of a screen. Communication between the field and the office is streamlined where everyone has access to real-time project details. This helps avoid duplicate entry errors and rework because teams built from an outdated drawing. In addition to drawings and details, project management software brings contracts, submittals, RFIs, billings, safety reporting, meeting minutes, photos, and financial reporting into one platform.
Base Price:
$25.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Shotcrete has been used widely for rehabilitation and retrofit of concrete structures. More and more large infrastructures, in particular, in the hydro power industry, is using shotcrete for major rehabilitation and retrofit. Recently, the US Army Corps of Engineers has been engaged in structural modifications to reinforced concrete draft tube exits from the turbines in the Ice Harbor Lock and Dam located on the Snake River, Washington. This presentation details the structural modification to the draft tube which was successfully completed using wet-mix shotcrete.
Base Price:
$40.00

On Demand

Duration:
43 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Since the invention and introduction of Portland cement-based, self-leveling underlayments in the U.S. in 1978, sub-floor preparation technologies, means and methods have continuously evolved. This evolution has been driven by dynamic market forces, including more manufacturers, a larger and more experienced installer base, increased adoption rates with a wider range of applications, ever-increasing project sizes and complexity, new flooring structures with more demanding requirements, the ability to handle high moisture levels with less surface preparation and fast track construction.
Base Price:
$40.00

On Demand

Duration:
25 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Presentation will discuss Vision 2020 (Development, Successes and Challenges) as well as items which still need to be completed. This portion of the presentation will be followed by an overview of the presenter's perspective on the future needs for the concrete repair industry. All attendees will be invited to participate in a workshop to develop a complete list of industry needs (consensus if possible).
Base Price:
$40.00

On Demand

Duration:
41 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Richard Miller Treatment Plant is a 240 mgd cap. potable water treatment facility located in the California area of the Cincinnati, Ohio, US. After installing an advanced ultraviolet (UV) disinfection treatment system in 2013, GCWW became the largest water utility in North America to use UV light following sand filtration and granular activated carbon. The concrete filter gallery building was originally constructed in 1907 with 26 filters, with a 14-filter addition in 1937 and 7 filters added in 1964. After over 110 years of service, the structures started showing significant signs of deterioration, most commonly concrete spalling and reinforcing steel corrosion. This case study will highlight the methods used to evaluate the structures that involved conventional methods such as sounding, crack mapping, chemical and petrographic examinations, along with technology such as Half-Cell Potential/ICOR, Impact-Echo, Ground Penetrating Radar, and UAS (Drone) services.
Base Price:
$25.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
The general sentiment around construction and modern technology is that the industry has been slow to embrace it. While this is true of the past, the current and future construction industry is all about modern technology. Not only does technology help to make the industry safer (something that has been a struggle for a very long time), but it is helping contractors to take back control of their budgets, to make smarter choices about project planning and equipment and is, consequently, pushing the green-construction trend forward. The purpose of this presentation is to provide a summary on the current technologies being used in the construction industry with a focus on concrete and to dig even further as to how these can be applied to repair projects. It will provide case studies on how using technology to bring ambient and concrete temperature, relative humidity and strength (among other) data online can help contractors be more efficient.
Base Price:
$25.00

On Demand

Duration:
1 hour
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Concrete is one of the most versatile building materials in the world and can produce floor slabs that provide an excellent platform for floor coverings and coatings. Water is an essential component of every concrete mixture.  Without it, concrete is not workable and finishable. If water is not used, the cement in the mixture cannot hydrate and gain the required strength.  However, once placement, finishing, and curing is complete, remaining moisture in the concrete can adversely affect the installation of flooring materials and the behavior of the slab itself. This webinar will discuss the importance of water in a concrete mixture and review a few concrete problems that water can cause, such as shrinkage, curling, ASR, delamination, dusting, and scaling. In addition, attendees will learn the design and construction considerations that can be used to minimize the potentially adverse effects of moisture in concrete.
Base Price:
$40.00

On Demand

Duration:
47 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
After only six years of service, a 6-foot long narrow piece of concrete spalled off an exposed slab edge of a 680-foot tall high-rise in Texas, and fell 160 feet to the podium below. The spall was attributed to premature corrosion at the drip edge. The building featured approximately 9,200 feet of exposed slab edge over its height. Given the potential risk to safety and property of additional concrete spalls, the Owner requested forensic investigations, which (1) identified other areas with signs of similar distress and (2) determined the underlying problem of low reinforcement cover at the drip edge was pervasive. In response, repair options were developed to address the problem and restore intended durability. Given the building height, difficult exterior-only access, downtown environment, and post-tensioning anchors along the slab edge, the repair design and construction both had unique challenges to consider and overcome.
Base Price:
$40.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
This update includes fall protection requirements for low slope roofs, façade access, and ladders as well as a timeline for compliance. This seminar not only addresses the recent 2017 updates to 29 CFR Part 1910 General Industry, but is an overview of all fall protection standards found in both Part 1910 for General Industry and Part 1926 Construction. The components of a Comprehensive Managed Fall Protection Program are also presented as well as specific requirements for the fall protection options available. Because many in the industry either do not understand the standards, are unaware of the available OSHA interpretations, or prefer not to spend money training their employees, misinformation is being spread. This seminar provides the truth about the required implementation of the updated fall protection standards and the standards that remain in place.
Base Price:
$40.00

On Demand

Duration:
14 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
The demonstration will include historical products and processes used for repair of tilt-up wall and precast concrete structures, new technology developments, proper material selection, and application methods.
Base Price:
$5.00

Please wait ...

Back to Top