Skip to main content

International Zoom 2021


On Demand

Duration:
43 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Increasingly, the Construction Industry is being dramatically impacted globally by internal and external forces. These influences range from acute labor and skill shortages, demographic and urbanization shifts, as well as, the Industry’s conversion from analog-based processes to digital workflows. This presentation will overview ten significant trends which are uniquely affecting the Construction Industry, creating both new challenges and opportunities, while transforming the Construction Industry.
Base Price:
$25.00

On Demand

Duration:
43 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Since the invention and introduction of Portland cement-based, self-leveling underlayments in the U.S. in 1978, sub-floor preparation technologies, means and methods have continuously evolved. This evolution has been driven by dynamic market forces, including more manufacturers, a larger and more experienced installer base, increased adoption rates with a wider range of applications, ever-increasing project sizes and complexity, new flooring structures with more demanding requirements, the ability to handle high moisture levels with less surface preparation and fast track construction.
Base Price:
$25.00

On Demand

Duration:
43 Minutes
Format:
Audio and Video
License:
Short Description:
Technology is not limited to innovative materials or equipment on a jobsite. Digital technology is changing how teams operate and is dramatically increasing efficiency and effectiveness. Cloud-based project management software allows key stakeholders to consolidate project data on to one mobile platform for easy collaboration. The entire project team, from general contractors, specialty contractors, owners, architects, engineers, conservators, and others can exchange data and documents with the tap of a screen. Communication between the field and the office is streamlined where everyone has access to real-time project details. This helps avoid duplicate entry errors and rework because teams built from an outdated drawing. In addition to drawings and details, project management software brings contracts, submittals, RFIs, billings, safety reporting, meeting minutes, photos, and financial reporting into one platform.
Base Price:
$25.00

On Demand

Duration:
44 Minutes
Format:
Audio and Video
License:
Short Description:
Arrowhead Stadium originally opened in 1972 and is known to be the home to the Super Bowl Champions Kansas City Chiefs. Renovations of the stadium completed in 2010 included adding luxury suites on the club level of the stadium. This meant that the upper seating bowl not only had to seat more than 34,000 Chief fans but also act as a "roof" for the new luxury suites. The upper seating bowl comprises L-shaped precast concrete seating risers spanning from cast-in-place concrete raker beams and is divided by sixteen expansion joints. In 2018, the planning for the upper seating bowl waterproofing program began. The goal for the repair project was to implement waterproofing upgrades to protect the concrete for the next 10 years. To add to the challenge of a large-scale waterproofing and structural repair project, the construction efforts had to include coordination with simultaneous seat replacement to be completed in a single off-season.
Base Price:
$25.00

On Demand

Duration:
44 Minutes
Format:
Audio and Video
License:
Short Description:
Historic 19th and 20th century buildings are currently facing the necessity of meeting contemporary needs such as adaptive re-use, energy efficiency, stability, and durability. The characteristics of architecture of these periods (i.e., material, design, details, maintenance, and functionality) increasingly make it challenging to maintain authenticity while incorporating new uses. Various strategies of technical interventions can be employed to achieve good results. This presentation will cover the case study of abandoned historic hospital pavilions from the early 20th century which are being converted into a high-end residential complex. The buildings face multiple challenges related to adaptive re-use, as they will be restored and connected with new infills and a glass connector and capped with re-creation of the historic cornices.
Base Price:
$25.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
ICRI in-person conventions consist of numerous networking opportunities. In many cases, we catch up with old friends who we have not seen in a while, and get to know new friends. Great stories abound, including how ICRI members came to be involved in the organization. Tune in to hear some of these stories in a relaxed, “sitting-at-the-bar” exchange among notable ICRI leaders.
Base Price:
$0.00

On Demand

Duration:
49 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Dallas City Hall and Plaza are recognized by many due to the opening scenes of Dallas, the television show. What is less known is that the structure is a significant early example of bonded post-tensioned concrete which was utilized throughout the superstructure and two-story parking garage constructed beneath the plaza. Opened in 1977, the parking garage is a two-way bonded post-tensioned concrete slab with unreinforced drop panels supported by flared circular concrete columns. The garage covers two city blocks, extends under two adjacent multi-lane streets, and supports mature landscaping, pool, fountain, and up to 11’-0” of soil. In 2017, several square feet of a drop panel fell from the structure and subsequent observations found multiple locations of drop panel and column capital failures. A structural investigation including destructive and non-destructive testing, and analysis of the existing structure was undertaken to determine the cause of the failures.
Base Price:
$25.00

On Demand

Bundle:
Fall Conference Bundle
Duration:
47 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
What happens when a building owner calls with leaks into a building they just finished? After verifying whether they want to file a lawsuit or not, the course of action is important. An investigation and preliminary testing are typically recommended to understand the original design and the quality and consistency of the construction. Design of remedial repairs and a pilot repair program followed by retesting to confirm results. How extensive are the failures and how invasive do the repairs need to be? Costs? What materials were used and were they compatible? Public perception and developer/owner reputation are important. The occupants have just moved in. Higher expectation of successful repairs. Can we involve the original design and construction team? These are just a few of the issues that need to be faced early in this process. One must communicate often and clearly with the owner and rest of the project team in order to manage expectations, costs and construction quality control.
Base Price:
$25.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Shotcrete has been used widely for rehabilitation and retrofit of concrete structures. More and more large infrastructures, in particular, in the hydro power industry, is using shotcrete for major rehabilitation and retrofit. Recently, the US Army Corps of Engineers has been engaged in structural modifications to reinforced concrete draft tube exits from the turbines in the Ice Harbor Lock and Dam located on the Snake River, Washington. This presentation details the structural modification to the draft tube which was successfully completed using wet-mix shotcrete.
Base Price:
$25.00

On Demand

Duration:
45 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
This update includes fall protection requirements for low slope roofs, façade access, and ladders as well as a timeline for compliance. This seminar not only addresses the recent 2017 updates to 29 CFR Part 1910 General Industry, but is an overview of all fall protection standards found in both Part 1910 for General Industry and Part 1926 Construction. The components of a Comprehensive Managed Fall Protection Program are also presented as well as specific requirements for the fall protection options available. Because many in the industry either do not understand the standards, are unaware of the available OSHA interpretations, or prefer not to spend money training their employees, misinformation is being spread. This seminar provides the truth about the required implementation of the updated fall protection standards and the standards that remain in place.
Base Price:
$25.00

Please wait ...

Back to Top