Skip to main content

Admin-Bulk


PDF

License:
Short Description:
This guide specification aids the Design Professional in the preparation of technical specifications for inclusion directly into a project manual for the construction of cementitious bonded overlays that are in line with the state-of-the-art materials and methods used in the concrete repair industry. The document provides an outline for developing the three parts of the specification through suggested text, references, and commentary for evaluating alternatives. This specification section must be used with ICRI 110.1, Guide Specifications for Structural Concrete Repairs. Both the printed and PDF copies include a Word document with hidden text for easy modification of text to meet specific cementitious bonded overlay project requirements. PDF version is free to ICRI members when ordered online.
Base Price:
$80.00 Non-Members
Price with Discount:
$55.00

Books

Publication Date:
Mar 26, 2021
License:
Short Description:
This guide specification aids the Design Professional in the preparation of technical specifications for inclusion directly into a project manual for the construction of cementitious bonded overlays that are in line with the state-of-the-art materials and methods used in the concrete repair industry. The document provides an outline for developing the three parts of the specification through suggested text, references, and commentary for evaluating alternatives. This specification section must be used with ICRI 110.1, Guide Specifications for Structural Concrete Repairs. Both the printed and PDF copies include a Word document with hidden text for easy modification of text to meet specific cementitious bonded overlay project requirements. PDF version is free to ICRI members when ordered online.
Base Price:
$80.00 Non-Member Price
Price with Discount:
$55.00

Books

License:
Short Description:
This bundle includes the 110.1 (2016), 110.2 (2020), 330.2 (2016) Guide Specifications. The documents cover Guide Specifications for Structural Concrete Repair, Epoxy Injection, and Externally Bonded FRP Fabric Systems for Strengthening Concrete Structures, respectively.
Base Price:
$120.00 Non-Members
Price with Discount:
$95.00

On Demand

Duration:
1 hour
Format:
Audio and Video
License:
Short Description:
Testing moisture in concrete doesn't need to be complicated. Five (5) currently recognized ASTM test protocols for testing concrete slabs for moisture will be explained using the "How and Why" perspective while providing the proper, yet basic, scientific context behind their usage.
Base Price:
$40.00
Price with Discount:
$15.00

On Demand

Duration:
3 Minutes
Format:
Audio and Video
License:
Short Description:
This demonstration will show FastPatch DPR, an easy to install, long-lasting repair material for distressed pavement that can be applied in warm or cooler climates. It can be used with FastPatch Kicker (accelerator) to form a fast-curing permanent repair that is ready for traffic in a short period of time. DPR has excellent adhesion, absorbs impact and is freeze-thaw resistant. It can easily create smooth transitions and ultra-tough level surfaces. Its minimal site preparation and fast cure times reduce traffic interruptions. The product is completely odorless making it also suitable for indoor applications.
Base Price:
$5.00
Price with Discount:
$0.00

On Demand

Duration:
6 Minutes
Format:
Audio and Video
License:
Short Description:
This demonstration will take the audience through the entire process involved in the safe and effective installation of our GeoTree RenewWrap CFRP product.
Base Price:
$5.00
Price with Discount:
$0.00

On Demand

Duration:
41 Minutes
Format:
Audio and Video
License:
Short Description:
Richard Miller Treatment Plant is a 240 mgd cap. potable water treatment facility located in the California area of the Cincinnati, Ohio, US. After installing an advanced ultraviolet (UV) disinfection treatment system in 2013, GCWW became the largest water utility in North America to use UV light following sand filtration and granular activated carbon. The concrete filter gallery building was originally constructed in 1907 with 26 filters, with a 14-filter addition in 1937 and 7 filters added in 1964. After over 110 years of service, the structures started showing significant signs of deterioration, most commonly concrete spalling and reinforcing steel corrosion. This case study will highlight the methods used to evaluate the structures that involved conventional methods such as sounding, crack mapping, chemical and petrographic examinations, along with technology such as Half-Cell Potential/ICOR, Impact-Echo, Ground Penetrating Radar, and UAS (Drone) services.
Base Price:
$25.00
Price with Discount:
$0.00

On Demand

Duration:
18 Minutes
Format:
Audio and Video
License:
Short Description:
The demonstration will show the ins and outs of Sika's FRP installation process with the multiple system options Sika offers to help with your needs for a proper install on site.
Base Price:
$5.00
Price with Discount:
$0.00

On Demand

Duration:
6 Minutes
Format:
Audio and Video
License:
Short Description:
Vertical/overhead repair mortars are traditionally hand- or spray-applied. Small repairs are suitable for hand application; whereas, low pressure spray equipment is useful for large projects. Mortar guns are commonly used for tuckpointing applications using site-mixed, masonry mortar. As most vertical/overhead concrete repair materials exhibit a stiff consistency, such mortar guns have not been widely implemented in concrete repair applications. With its unique, thixotropic rheology, MasterEmaco N 425 is well suited for use with such equipment. This demonstration presents the ease of application of MasterEmaco N 425 using a Quikpoint 3000 mortar gun.
Base Price:
$5.00
Price with Discount:
$0.00

On Demand

Duration:
14 Minutes
Format:
Audio and Video
License:
Short Description:
Hands-on application of leak repair and surface applied waterproofing products.
Base Price:
$5.00
Price with Discount:
$0.00

Please wait ...

Back to Top