Skip to main content

Not Found
On Demand

Presenters:
Mike Tracy
Duration:
43 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Increasingly, the Construction Industry is being dramatically impacted globally by internal and external forces. These influences range from acute labor and skill shortages, demographic and urbanization shifts, as well as, the Industry’s conversion from analog-based processes to digital workflows. This presentation will overview ten significant trends which are uniquely affecting the Construction Industry, creating both new challenges and opportunities, while transforming the Construction Industry.
Price:
$15.00 - $25.00

Not Found
On Demand

Presenters:
Dr. Farhad Habibi, PhD |  Justin Breg, PhD
Duration:
36 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Alkali-Silica Reaction (ASR) can cause significant damage to concrete structures including bridges, roadways, airport runways, and nuclear power plants. When reactive aggregates are included in a mix, the presence of moisture initiates a reaction between the alkaline cement paste and reactive amorphous silica. The result is a gel that continues to dilate, which may cause cracks in the concrete mass. A research program was undertaken at the University of Toronto to investigate the effects of ASR on large-scale and small-scale concrete specimens. Several specimens were constructed using reactive (ASR) concrete and non-reactive (regular) concrete, and their short-term and long-term structural and mechanical behavior were compared. In this presentation, we will discuss the results of the research program, will offer best practices to minimize the risk of ASR in concrete during placement, and will propose several strategies for repair of structures that have been degraded due to ASR.
Price:
$0.00 - $40.00

Not Found
On Demand

Presenters:
Hamed Layssi
Duration:
45 Minutes
Format:
Audio and Video
License:
Short Description:
The application of nondestructive testing and evaluation for detecting existing defects and anomalies in concrete structures will be presented. Proper inspection and assessment is an integral part of a successful repair and rehabilitation. A well-defined inspection will help asset owners and their consultants in identifying the location and extent of existing defects, and enabling them in selecting proper repair materials and optimizing the area that needs rehabilitation. Moreover, NDT methods can help identify potential defects that are not visible to the naked eye, such as early-stage delamination, corrosion, and other durability related issues. In this presentation, several cases in Canada will be demonstrated, where the results of nondestructive testing and evaluation have been used to help consultants and contractors with cost-effective and reliable repair planning. Applications of ground penetrating radar, ultrasonic pulse echo tomography, seismic tomography, will be discussed.
Price:
$15.00 - $25.00

Not Found
On Demand

Presenters:
Mr. Kristian Krc |  Mr. David T Ford
Duration:
44 Minutes
Format:
Audio and Video
License:
Short Description:
Arrowhead Stadium originally opened in 1972 and is known to be the home to the Super Bowl Champions Kansas City Chiefs. Renovations of the stadium completed in 2010 included adding luxury suites on the club level of the stadium. This meant that the upper seating bowl not only had to seat more than 34,000 Chief fans but also act as a "roof" for the new luxury suites. The upper seating bowl comprises L-shaped precast concrete seating risers spanning from cast-in-place concrete raker beams and is divided by sixteen expansion joints. In 2018, the planning for the upper seating bowl waterproofing program began. The goal for the repair project was to implement waterproofing upgrades to protect the concrete for the next 10 years. To add to the challenge of a large-scale waterproofing and structural repair project, the construction efforts had to include coordination with simultaneous seat replacement to be completed in a single off-season.
Price:
$15.00 - $25.00

Not Found
On Demand

Presenters:
Baruch Gedalia
Duration:
1 hour
Format:
Audio and Video
License:
Short Description:
This presentation aims at providing clear and down to earth definitions of what Post-Tensioning systems are, the different repair strategies related to these systems, and critical factors to be accounted for during the design and execution of any intervention on a Post-Tensioning slab. 
Price:
$0.00 - Base Price

More info » Register
Not Found
On Demand

Presenters:
Mr. Peter FICRI Golter, P.E. FICRI, P.E. FICRI
Duration:
41 Minutes
Format:
Audio and Video
License:
Short Description:
This presentation looks at buildings that are new or being rehabilitated and the impact on making buildings more energy efficient. Starting with the 2012 IBC, and specifically the 2012 IECC portion of the building code and newer versions, the presentation will look at three aspects of the building envelope: Water Resistance, Air Leakage, and Moisture Transmission. It will then compare to identical buildings, the first built in 2000 and the second constructed in 2020. Illustrations and calculations will show how controlling air leakage can have an enormous impact on the service life of the structure, initial cost of construction, and on-going operations. Lastly, the presentation will look at how incorporating simple additions during the repair/rehabilitation process can have a positive impact on the environment as well as the building owner and the building’s constituents.
Price:
$15.00 - $25.00

Not Found
On Demand

Presenters:
Mr. Shayan Yazdani
Duration:
40 Minutes
Format:
Audio and Video
License:
Short Description:
Arlington Memorial Bridge is a reinforced concrete spandrel arch bridge that connects Washington, DC and Virginia across the Potomac River. After over 85 years in service, the bridge started exhibiting signs of deterioration, including reinforcement corrosion. As part of a major rehabilitation effort to extend the bridge’s service life, targeted cathodic protection (CP) systems were installed in the arch cross-walls, floors, and under arches to mitigate and prevent corrosion. The implemented CP system consisted of galvanic and two-stage anodes to mitigate corrosion. Galvanic anodes were installed in the repair areas to prevent the ring anode affect and ensure a durable concrete repair. The two-stage anodes were installed in areas of concrete which were actively corroding without signs of concrete deterioration.
Price:
$15.00 - $25.00

Not Found
On Demand

Bundle(s):
Fall Conference Bundle
Presenters:
Eric Hammarberg
Duration:
47 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
What happens when a building owner calls with leaks into a building they just finished? After verifying whether they want to file a lawsuit or not, the course of action is important. An investigation and preliminary testing are typically recommended to understand the original design and the quality and consistency of the construction. Design of remedial repairs and a pilot repair program followed by retesting to confirm results. How extensive are the failures and how invasive do the repairs need to be? Costs? What materials were used and were they compatible? Public perception and developer/owner reputation are important. The occupants have just moved in. Higher expectation of successful repairs. Can we involve the original design and construction team? These are just a few of the issues that need to be faced early in this process. One must communicate often and clearly with the owner and rest of the project team in order to manage expectations, costs and construction quality control.
Price:
$15.00 - $25.00

Not Found
On Demand

Bundle(s):
Fall Conference Bundle
Presenters:
Dr. Jacob L. Borgerson
Duration:
24 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
Concrete placement and finishing defects raised by a member of the project team may indicate a greater (unobserved) structural concern, a long-term durability issue, or simply an aesthetic problem. Concrete defects can delay the project schedule, require costly investigation fees, and necessitate removal and replacement. This presentation is intended to tackle concrete placement and finishing defects faced by the concrete construction industry. Topics will include: cold joints, delaminations, dusting, honeycombing, form leakage, plastic shrinkage cracking, floor flatness/levelness, in addition to others. This presentation will discuss the causes of these concrete defects, techniques for evaluating various defects, and approaches for mitigating these problems. Attendees will be introduced to various evaluation methods (e.g., impact-echo, ultrasonic pulse velocity, ground penetrating radar, concrete coring, petrographic examination, etc.) and when their use is appropriate.
Price:
$15.00 - $25.00

Not Found
On Demand

Presenters:
Mr. Leon Geoxavier
Duration:
29 Minutes
Format:
Audio and Video
License:
Access for 6 month(s) after purchase.
Short Description:
High Traffic Commercial/Light Industrial applications including light manufacturing, warehouse/big-box stores and high traffic retail applications present their own unique challenges in concrete repair. This presentation will review concrete repair options that a focused on those application that may require both fast application/turnaround time and strength/use durability for forklifts and trucks. High Traffic Commercial/Light Industrial applications including light manufacturing, warehouse/big-box stores and high traffic retail applications present their own unique challenges in concrete repair. This presentation will review concrete repair options that a focused on those application that may require both fast application/turnaround time and strength/use durability for forklifts and trucks. While there are many option for quick repair that can be open to use in a matter of hours, it is important to acknowledge he potential limitations of these options over the long term.
Price:
$0.00 - $40.00

Please wait ...

Back to Top